In preparing an estimate, the relationship between duration and effort is:

Prepare for the Landini CAPM exam with this comprehensive quiz. Study with flashcards and multiple choice questions, accompanied by detailed explanations and hints. Be ready for your certification!

Multiple Choice

In preparing an estimate, the relationship between duration and effort is:

Explanation:
The main idea is that duration is the calendar time needed to finish an activity, while effort is the total amount of labor required to complete it. If an activity needs 8 labor hours, one person would take 8 time units, but with two people working in parallel, the duration could be reduced to 4 time units while the total effort remains 8 labor hours. That’s why duration is described as the total number of work periods to complete the activity, and effort is the number of labor units required. Other options mix up time and labor or confuse planned versus actual timing, which isn’t how these concepts are defined.

The main idea is that duration is the calendar time needed to finish an activity, while effort is the total amount of labor required to complete it. If an activity needs 8 labor hours, one person would take 8 time units, but with two people working in parallel, the duration could be reduced to 4 time units while the total effort remains 8 labor hours. That’s why duration is described as the total number of work periods to complete the activity, and effort is the number of labor units required. Other options mix up time and labor or confuse planned versus actual timing, which isn’t how these concepts are defined.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy